The CIRC4FooD project will last 24 months and is divided into five (5) Work Packages (WPs).

More specifically, the WPs of the project are:

  • WP1: Design of the Systems proposed
  • WP2: Systems Development
  • WP3: Pilot tests
  • WP4: Evaluation of the Results - System's Improvement
  • WP5: Future Extensions